1. Engineering Design

1.1 Heritage and Conservation

Aba Jifar 1 Aba Jifar 2 Aba Jifar 3

Jima Abaajifaar Palace Conservation & Development

Client: Ethiopian Roads Administration

Value: $104,259.89

Description: Condition survey, heritage conservation design, functional rearrangement, landscape and master plan, expansion, tourist site concept, 3D site plan and animation.

Status: Completed

Aba Jifar Landscape

Jimma Aba Jifar Palace Landscape Design

Client: Ministry of Tourism

Value: $267,947.37

Description: Geotechnical, hydrological, topographic, architectural, structural, MEP, access roads, bridges, interior, landscape, sanitary, cost estimation, tender docs.

Status: Completed

1.2 Sport Infrastructure

Aba Jifar 1 Aba Jifar 2 Aba Jifar 3 Aba Jifar 3

Arbaminch Stadium

Client: Arbaminch City Administration

Value: $293,120.72

Description: Detailed architectural and engineering design, tender document and engineering cost estimate preparation, ESIA study, and construction supervision for Arbaminch Multi-Purpose Stadium. Phase I focused on delivering CAF 2022-compliant documentation and design, ensuring inclusive facilities for spectators, athletes, media personnel, and event staff. The stadium is envisioned as a vibrant hub for sports and cultural gatherings, contributing to regional tourism and civic pride.

Status: Completed

1.3 Tourism and Hospitality Facilities

Aba Jifar 1

Koysha Dam & Chebera–Churchura National Park Development

Client: Ethiopian Roads Administration

Value: $24,914.69

Description: Conceptual planning for the integrated development of Koysha Dam, Chebera–Churchura National Park, and Halala Kela Historical Area. The service included identification of potential activity zones within the park, preliminary engineering cost estimates for internal road connections and park facilities, and 3D modeling and presentation of the envisioned development. The project aimed to harmonize ecological preservation with cultural and recreational accessibility.

Status: Completed

Aba Jifar Landscape

Unity Park Access & Panoramic Podium Design

Client: Ethiopian Roads Administration

Value: $68,343.80

Description: Topographic survey and detailed engineering design of internal access roads within Unity Park, integrated drainage system design, and construction supervision of the roadworks. The project also included the conceptual architectural design of a panoramic view podium, envisioned to enhance visitor experience and spatial harmony within the park’s landscape.

Status: Completed

1.4 Transport Infrastructure

Aba Jifar 1

Addis Ababa Urban Corridor Design – Lots 1, 2 & 3

Client: Addis Ababa City Roads Authority

Value: $128,403.10

Description: Detailed engineering design, tender document preparation, and design review for three major urban corridors: Lot 1 (Bole Airport Roundabout to Megenagna Diaspora Square), Lot 2 (4 Killo–Meskel Square–Bole Bridge), and Lot 3 (Megenagna Diaspora Square to 4 Killo). The project included master planning and corridor determination, topographic survey, Resettlement Action Plan (RAP), and Land Acquisition Plan. Design elements encompassed walkways, cycle lanes, public parks, transit access, street lighting, bus and taxi terminals, landscape architecture, traffic modeling, stormwater drainage, and full geometric, pavement, geotechnical, and utility integration.

Status: Completed

Efeson–Mehalmeda Road Project

Client: YENCOMAD Construction Plc

Value: $276,298.78

Description: Comprehensive consultancy services including detailed engineering design, working drawing preparation, as-built documentation, and ongoing technical assistance for the Efeson–Mehalmeda Road Project. The work supported seamless execution and ensured alignment with structural and geotechnical standards throughout the project lifecycle.

Status: Completed

1.5 Water Infrastructure

Aba Jifar 1

Sherkole River Water Supply System

Client: International Rescue Committee

Value: $15,196.41

Description: Detailed assessment and design of a surface water supply system sourced from the Sherkole River, serving both refugees and the host community adjacent to Sherkole Camp. The project included a comprehensive feasibility study and an Environmental and Social Impact Assessment (ESIA), ensuring sustainable access to clean water while respecting ecological and community dynamics.

Status: Completed

2. Engineering Contract Management

2.1 Heritage and Conservation

Aba Jifar 1 Aba Jifar 2 Aba Jifar 3 Aba Jifar 3 Aba Jifar 3

Aba Jifar Palace Conservation & Compound Development

Client: Ministry of Tourism

Value: $492,341.02

Description: Construction supervision for the conservation, restoration, and compound development of the historic Aba Jifar Palace. Activities include design review, quality control, inspection of works, contract administration, right-of-way management, and public consultation. The project honors Ethiopia’s architectural heritage while ensuring modern standards of execution and community engagement.

Status: On progress

2.2 Sport Infrastructure

Aba Jifar 1 Aba Jifar 2 Aba Jifar 3 Aba Jifar 3

Arbaminch Stadium – Phase II: Construction Supervision

Client: Arbaminch City Administration

Value: $175,088.72

Description: Ongoing construction supervision for the Arbaminch Multi-Purpose Stadium. Activities include design review, quality control, inspection of works, contract administration, right-of-way management, and public consultation. This phase ensures that the stadium’s physical realization aligns with its visionary design and community-centered purpose.

Status: On progress

2.3 Tourism and Hospitality Facilities

Aba Jifar 3 Aba Jifar 3 Aba Jifar 1 Aba Jifar 2

Arbaminch Conference Resort – Design & Build Supervision

Client: Gebeta Le Tewuled Initiatives Arbaminch Conference Resort Project Management Office

Value: $631,801.41

Description: Construction supervision for the Arbaminch Conference Resort Design and Build Project. Scope of work includes design review, quality control, inspection of construction activities, contract administration, right-of-way management, and public consultation. The project aims to deliver a landmark destination that blends hospitality, cultural expression, and architectural excellence.

Status: On progress

Aba Jifar Landscape Aba Jifar Landscape Aba Jifar Landscape

Bale Mountains National Park – Phase II: Tourist Destination Development

Client: Ministry of Tourism

Value: $658,905.75

Description: Construction supervision for Phase II of the Bale Mountains National Park Tourist Destination Development Project. Activities include design review, quality control, inspection of works, and contract administration. The project supports the transformation of the park into a sustainable and welcoming destination, balancing natural preservation with visitor accessibility.

Status: On progress

Aba Jifar Landscape Aba Jifar Landscape Aba Jifar Landscape Aba Jifar Landscape Aba Jifar Landscape

Koysha Integrated Tourist Destination Development

Client: Ethiopian Roads Administration

Value: $572,981.17

Description: Design services and management for the integrated development of the Koysha tourist destination projects. Scope includes concept designs for Halala Kella Luxury Lodge, Chebera Luxury Lodge, and associated facilities; preparation of a Concept Note for integration across development sites; design review and supervision of lodges and infrastructure at Halala Kella, Chebera, and Gudumu; and technical assistance for construction supervision and strategic integration under the Gebeta Lehager initiative. The project seeks to harmonize luxury tourism with ecological and cultural stewardship.

Status: On progress

2.4 Transport Infrastructure

Aba Jifar 1

Abay River Bridge & Approach Road – Lot 1

Client: Ethiopian Roads Administration

Value: $2,976,520.64

Description: Construction supervision for Lot 1 of the Abay River Bridge and Approach Road Design and Build Project, covering the bridge structure and adjacent concrete works. Activities included design review, quality control, inspection of works, contract administration, right-of-way management, and public consultation. The project plays a pivotal role in regional connectivity and infrastructure resilience.

Status: Substantially Completed

Aba Jifar Landscape

Chereti–Goroboksa–Gorodamole Road Project – Lot II (Hargere Mekor–Kundi, 102 Km)

Client: Ethiopian Roads Administration

Value: $1,006,929.76

Description: Design review and supervision for Lot II of the Chereti–Goroboksa–Gorodamole Road Project, covering the 102 km stretch from Hargere Mekor to Kundi. Services included quality control, inspection of works, contract administration, measurement and payment certification, right-of-way management, liaison with local leaders, and public consultation. The project supported regional connectivity and community engagement through technically sound and socially responsive execution.

Status: 100% Completed

Aba Jifar Landscape Aba Jifar Landscape Aba Jifar Landscape

Entoto Observatory Road Project (18.8 km)

Client: Ethiopian Roads Administration

Value: $307,100.34

Description: Design review and supervision for the Entoto Observatory – Ethiopia Management Academy Road Project, spanning 18.8 km from Entoto Mariam to the Space Observatory and Kotebe. Services include quality control, inspection of works, contract administration, right-of-way management, and public consultation. The project enhances access to key scientific and educational institutions, supporting national innovation and public engagement.

Status: On progress

2.5 Water Infrastructure

Aba Jifar 1 Aba Jifar 2 Aba Jifar 3

Wieb River Flood Control Design

Client: Ethiopian Roads Administration

Value: $216,782.79

Description: Concept design and construction supervision for the Wieb River Flood Control Project. Services include reviewing the completeness and adequacy of all survey and engineering design works performed by the DB contractor, providing approvals and suggestions for improvement, and overseeing construction supervision and contract administration. The project aims to mitigate flood risks while ensuring technical integrity and environmental responsiveness.

Status: On progress

3. Project Formulation

3.1 Arbaminch Resort City

Aba Jifar 1 Aba Jifar 2 Aba Jifar 3 Aba Jifar 3

Arbaminch Resort City Project

Client: Gebeta Le Tewuled Arbaminch Conference Resort Project Management Office

Description: Comprehensive concept design and full planning for the Arbaminch Resort City, including urban design, zoning, architectural style, landscaping, and key infrastructure elements. The project encompassed electrical, mechanical, and sanitary design for 128 blocks of holiday villas, envisioned to create a harmonious and vibrant destination rooted in cultural and environmental sensitivity.

Status: Completed

4. Research and Case Study

Aba Jifar 1

Investigation of Defects Observed on Asphalt Works For Alem Ketema – Degolo Road Upgrading Project

Client: Ethiopian Roads Administration

Value: $30,372.29

Description: This project focused on identifying the root causes of defects observed on the asphalt sections of the Alem Ketema – Degolo – Kelela Road Upgrading Project, specifically Contract I: Alem Ketema to Degolo. The investigation aimed to propose permanent solutions to ensure the continuation of pavement activities with improved structural integrity and long-term performance.

Status: Completed

Aba Jifar Landscape

Expert Panel Service for Escarpment Section of Goba – Berbere – Dolomena DB Road Project (Station 32+000 – 51+000)

Client: Alemayehu Ketema General Contractor

Value: $36,315.00

Description: This project involves expert panel services for the escarpment section of the Goba – Berbere – Dolomena Design and Build Road Project. The scope includes compilation, analysis, and evaluation of all relevant existing information, followed by field validation and route location. It also encompasses design optimization and re-calibration to ensure technical soundness and alignment with the terrain’s complexities.

Status: On Progress

Geotechnical Investigation and Structural Analysis Services Geotechnical Investigation and Structural Analysis Services Geotechnical Investigation and Structural Analysis Services

Geotechnical Investigation and Structural Analysis Services

Client: Midroc Investment Group – Akaki Modern Leather and Leather Products Manufacturing Plc

Value: $5,849.72

Description: This project involved conducting a structural analysis and geotechnical investigation for an existing building in Akaki, where construction had been halted over 20 years ago after the completion of two stories. The client intended to resume construction and sought to determine the feasibility of extending the building beyond four stories. As consultants, we assessed the current structural integrity along with the soil and foundation conditions to ensure safety, stability, and compliance with modern engineering standards. Based on our findings, we provided recommendations regarding the potential for additional stories and outlined necessary reinforcement or design modifications.

Status: Completed

 Addis – Gibe River Road Overlay Project  Addis – Gibe River Road Overlay Project  alt=

Alternative Pavement Design Proposal for Addis – Gibe River Road Overlay Project; Lot II: Sebeta – Kora (Km 15+000 – Km 79+000)

Client: Beaeka General Business Plc

Value: $8,152.96

Description: This project involved identifying the underlying causes of pavement distress along the Addis – Gibe River Road Overlay Project, Lot II: Sebeta – Kora (Km 15+000 – Km 79+000). Based on the findings, an alternative pavement design was proposed to address the observed issues and enhance the long-term performance and durability of the road section.

Status: Completed

5. Material Testing

Material Tests Material Tests Material Tests

Construction Material Tests for Various Road Projects

Client: Tekleberhan Ambaye Construction Plc

Description: This project involved conducting comprehensive construction material tests across multiple road projects, including Kotebe Kara (Lot 2) Road Project (2.85 km), Majchew–Mehoni Design and Build Road Project (17.4 km), Abomsa–Bedey–Dibu River Cheleleka Road Project Lot 1 & Lot 2 (204 km), and Tikur Wuha (Bishan Guracha)–Hawassa Design and Build Road Project (12 km). The scope of work included testing subgrade materials, borrow materials for capping and sub-base, quarry rock quality, sand and water quality, concrete compressive strength, and concrete mix design. These tests ensured that all materials met the required standards for durability, safety, and structural integrity across diverse terrains and project scales.

Status: Completed

Aba Jifar Landscape Aba Jifar Landscape

Construction Material Tests for Various Road Projects

Client: Biyafi Construction Plc

Description: This project involved conducting comprehensive construction material tests across a wide range of infrastructure works, including the Leltu Tika Bridge Project (20m span), Aleltu Guda Bridge Project (20m span), Yabelo Metagefersa–Shakiso Road Project; Contract 2: Oblo – Dermi (70 km), Fitche – Shebele – Botere Road Project (7.006 km), Shebele–Boteri–Gombol Road Project (4.5 km), Ejere – Amara Aftin and Gebabu Mazoria – Adancho Maintenance and Menjari – Gebabu Road Project (10.5 km), Maderia – Dagimo – Salayish Road Project (5.4 km), and Gombola – K/ Yesus Road Project, Lot 1 (9.8 km). The scope of testing included subgrade materials, borrow materials for capping and sub-base, quarry rock quality, sand and water quality, concrete compressive strength, concrete mix design for bridge construction, and DCP testing. These evaluations ensured that all materials met the required standards for structural integrity, safety, and long-term performance.

Status: Completed

Arbaminch Stadium Arbaminch Stadium Arbaminch Stadium

Arbaminch Stadium

Client: Ethiopian Roads Administration

Value: $104,259.89

Description: Condition survey, heritage conservation design, functional rearrangement, landscape and master plan, expansion, tourist site concept, 3D site plan and animation.

Status: Completed

Aba Jifar 1 Aba Jifar 2 Aba Jifar 3

Construction Material Tests for Various Road Projects

Client: Cross Land Construction

Description: This project involved conducting comprehensive construction material tests for two major infrastructure works: the Dembi-Dolo Town Internal Asphalt Concrete Road Project (12 km) and the Yabelo – Metagefersa – Shakiso Road Project: Contract II; Obolo–Dermi (69 km). The scope of testing included subgrade materials, borrow materials for capping and sub-base, quarry rock quality, sand and water quality, concrete compressive strength, concrete mix design, and DCP testing. These evaluations were essential to ensure material compliance with engineering standards and to support the structural integrity and longevity of the road projects.

Status: Completed

eltele–Wayu–Wondo–Erobre Road Project eltele–Wayu–Wondo–Erobre Road Project eltele–Wayu–Wondo–Erobre Road Project

Teltele–Wayu–Wondo–Erobre Road Project (41 km)

Client: MCG Construction Plc

Description: This project involved conducting a full suite of construction material tests for the Teltele–Wayu–Wondo–Erobre Road Project, spanning 41 kilometers. The scope included testing subgrade materials, borrow materials for capping and sub-base, quarry rock quality, sand and water quality, concrete compressive strength, concrete mix design, and DCP testing. These evaluations were essential to ensure that all materials met the required engineering standards for durability, safety, and long-term performance.

Status: Completed

Our Services

Engineering Design

Innovative, sustainable infrastructure solutions tailored to meet project and environmental standards.

Read More

Contract Management & Supervision

Quality, safety, and compliance through expert contract administration and construction oversight.

Read More

Project Formulation

Providing end to end service through.

Read More

Technical Assistance

Expert support for design, execution, compliance, and capacity building across infrastructure projects.

Read More

Research & Case Study

Insights into engineering challenges including slope failures, pavement distress, and geotechnical risks.

Read More

Material Testing

Testing of construction materials to ensure quality, safety, and compliance with standards.

Read More

Our Core Values

Our Achievements

🤝 Synergy

We have fostered partnerships that consistently deliver exceptional results, driving mutual success and exceeding expectations.

🏅 Excellence

We delivered projects that consistently exceed client's expectations.

🔒 Commitment

Our dedicated team of professionals consistently goes above and beyond to ensure client satisfaction and project success.

💡 Innovation

We provide innovative solutions in our projects that prioritize human well-being and consistently exceed client expectations.

⚖️ Ethics

Our success is rooted in strong ethical standards, ensuring transparency, integrity, and accountability in every aspect of our work.

👥

278+

Team Members

🏅

5+

Recognitions

80+

Completed Works

Our Clients

Governmental Clients

Non-Governmental Clients